Policy review of WC10.3.2 Work and Rest Scheme

Policy review of WC10.3.2 Work and Rest Scheme

63RD ANNUAL CONFERENCE, Singapore, 15-19 April 2024 WP No. 156 Policy review of WC 10.3.2 Work and Rest Scheme Presented by PLC   Summary IFATCA’s Technical and Professional Manual (TPM) holds a number of policies regarding the work and rest … Continued
Policy Review of ATS 3.20 Environmental Issues in ATM

Policy Review of ATS 3.20 Environmental Issues in ATM

65TH ANNUAL CONFERENCE, Abu Dhabi, 28 April – 2 May 2025 WP No. 101 Policy Review of ATS 3.20 Environmental Issues in ATM Presented by PLC & TOC   SUMMARYThe publication of several documents issued by international and national organisations, … Continued
Airport Infrastructure Development

Airport Infrastructure Development

58TH ANNUAL CONFERENCE, Conchal, Costa Rica, 20-24 May 2019 Agenda Item: B.5.1/C.6.1 – WP No. 86 Airport Infrastructure Development Presented by PLC and TOC Summary In order for an ATM system to work safely, efficiently and fluently at an airport, … Continued
WC 10.1.4 CIVIL MOBILISATION OR REQUISITION MEASURES

WC 10.1.4 CIVIL MOBILISATION OR REQUISITION MEASURES

  IFATCA Policy is: IFATCA strongly condemns the actions of governments in resorting to the use of civil mobilisation or requisition measures for the purpose of preventing or ending national disputes. Only negotiation or arbitration procedures shall be used to … Continued
WC 10.3.1 DUTY ROSTERS

WC 10.3.1 DUTY ROSTERS

  IFATCA Policy is: The duty roster should be based on at least 2 consecutive days off in every 7 days. Duty rosters should be agreed with the air traffic controllers involved. SPO shall be avoided. An optimal roster should … Continued
WC 10.7.4 INTRINSIC AND TACTICAL SAFETY

WC 10.7.4 INTRINSIC AND TACTICAL SAFETY

  IFATCA Policy is: IFATCA recommends that all parties involved in airport and airspace design address intrinsic safety with the highest priority. See: WP 169 – Arusha 2008  
LM 7.2.2 EXEMPTION FROM DUTY

LM 7.2.2 EXEMPTION FROM DUTY

  IFATCA Policy is: In the event of an alleged occurrence, the ATCO(s) shall have the opportunity to be relieved from control duties. IFATCA recommends the ATCO(s) be relieved. The relief shall be without prejudice and non-disciplinary. When the ATCO(s) … Continued
TRNG 9.4.1 A SYSTEM COMBINING ASSESSMENTS WITH EXAMINATIONS

TRNG 9.4.1 A SYSTEM COMBINING ASSESSMENTS WITH EXAMINATIONS

  IFATCA Policy is: During training at an Approved Training Organisation (ATO), assessments on all theoretical subjects should be carried out. Results should be analysed and discussed with the trainees. Multiple assessments and debriefings should take place consistently throughout the … Continued
Normal Operations Safety Survey – NOSS

Normal Operations Safety Survey – NOSS

44TH ANNUAL CONFERENCE, Melbourne, Australia, 17-22 April 2005 WP No. 161 Normal Operations Safety Survey – NOSS Presented by PLC Introduction 1.1. This subject was added to the PLC agenda for the year 2004-2005 by Committee C, after a very … Continued
Provision of ATS over Foreign Territories

Provision of ATS over Foreign Territories

57TH ANNUAL CONFERENCE, Accra, Ghana, 19-23 March 2018 WP No. 163 Provision of ATS over Foreign Territories Presented by PLC Summary For several reasons ATC is sometimes responsible for airspace of two or more countries. For ATCOs working this airspace, … Continued