Knowledge Base Category: 2024
- A Further Study into Interactions Between Remotely Piloted Aircraft Systems and ATC
- Confusion With Leased Aircraft Markings and Callsigns
- Considerations for the Global Deployment of FF-ICE
- Deactivation of Safety Nets
- Definition of an ATCO
- Policy Review LM 7.5 Unsafe Airspace/Aerodrome
- Policy review of WC10.3.2 Work and Rest Scheme
- Policy Review: Terrain and Obstacle Clearance
- Remote Tower Policy: An Analysis of Simultaneous Operations
- Review of Automation Policies
- Review of the IFATCA Training (TRNG) Policy
- Space Based Communication and Surveillance
- System-Based Air Traffic Controller Licence Concept
- TPM Policy Review: Pronunciation of Words and Five Letter Naming Codes
- UAS Flight Rules
- VFR Flights and Airspace Capacity Model Analyses
- VFR Traffic Workload and capacity Study